Groundworks and access road for the construction of a new build gospel hall for main contractors Shaylor Group Plc. 
 
Pavilion’s schedule of works includes; 
 
Reduce dig 
Bulk filling 
Foundations to dpc 
Drainage 
Septic tank 
Access road 
Car parking 
External works 
 
new site liverton 
 
reduce dig 
 
Smithaleigh, Lee Mill – Spectrum Energy Systems Ltd – New Wind Turbine Bases – 2015 
Another renewable energy project for Spectrum in South Devon.  
 
Our works include; 
 
Excavation of two turbine bases 
Concrete blinding 
Fabrication of steel re-inforcing 
Mass concrete pour 
Setting of turbine bases 
 
 
Rattery, South Brent – Coyde Construction Ltd – Groundworks Package – 2015 
 
Schedule of works to include; 
 
Clear and tidy site 
Reduce level dig 
Filling to make up levels 
Foundations up to dpc 
Construction of roads 
Construction of sewers 
Retaining walls 
External works 
 
Wind Turbine Project – Spectrum Energy Systems Ltd (On Behalf Of South Brent Community Energy Society Ltd) 
 
An exciting renewable energy project for this South Brent community, being 1 of only 50 community projects in the whole country. The 225 kw wind turbine at Marley in the South Hams is being constructed to generate an income from the sale of electricity and the Feed-In-Tariff. The funds will then be used towards improving the energy efficiency of South Brent and towards further renewable energy re-generation projects for the community. Pavilion’s works include; 
 
Creation of new 185 metres long access track across field 
Construction of crane hard standing 
Excavation and casting of reinforced turbine base 
Service trenching, ducting and earthing cable, back filling and re-instating works 
 
Torquay – Hymid Multi-Shot Ltd – 2015 
 
Small project works to construct; 
 
Extension to concrete hardstanding to form access to sub-station 
 
Paignton – Beverley Holidays, Beverley Bay Caravan Park – Improvement Works – 2015 
 
A super family run holiday park set on The English Riviera, undertaking upgrading works to their site for the new season. Our project works include; 
 
Breaking up redundant bases 
Re-profiling bank 
Extending existing bases 
Forming new access driveways and associated paving 
 
Click on this text to edit it. 
Upton Pine Exeter – Coyde Construction Ltd – Groundworks Package For 7 New Homes – 2015 
 
Access entry, strip top soil and excavate to reduce levels. 
Construction of sewers and manholes. 
Formation and construction of new road. 
Reduce levels for plots and excavate for concrete foundations. 
Blockwork to sub structures 
Block and beam floors 
Domestic drainage 
Formation of parking areas 
Paving slabs and all external works to new houses. 
 
Bratton Clovelly – Private Client – Design And Build Project – 2015 
 
A project to construct a stunning architect designed, contemporary dwelling built to maximise the spectacular countryside views of the Tors of Dartmoor. 
 
Our project management works involve the demolition of existing dwelling and replacement with a single storey house constructed over three levels with triple garage and ancillary outbuildings. 
Extensive groundworks and landscaping works including curved gabion walls and high natural stone walls. 
Complete package of renewable energy systems. 
The property will be constructed to be as self energy sufficient as possible with limited maintenance and built to a very high quality finish. 
We aim to deliver our build to a code level 4/5 and with a SAP “A” rating. 
 
Bradninch – CG Fry & Sons – Groundworks And External Works For 15 New Dwellings – 2015 
 
Works include; 
 
Site preparation, stripping topsoil 
Foundations 
Domestic and mains drainage, sewers 
Construction of car parking areas 
Roads 
External Works 
 
Duckford, South Hams – CG Fry & Sons – Individual Waterside, New Build – Ground works And Externals – 2015 
 
A stylish brand new home being constructed in a beautiful riverside setting, by main contractor CG Fry & Sons. Pavilions works include a complete foundation package and all externals to include; 
 
Partial demolition works 
Piled house foundations with reinforced groundbeams 
Block and beam floors 
Blockwork up to dpc 
Drainage 
Curved sandwich retaining walls 
Treatment tank 
Construction of bridge over stream 
Reduced dig for triple garage 
 
Marlborough, South Hams – CG Fry & Sons – External Works – 2015 
 
Final stage of external works to 17 new houses. Pavilion’s contract of works includes; 
 
New tarmac road 
Paviors to communal areas and parking spaces 
Creation of patios to new houses 
Edgings and steps. 
Top soiling of gardens 
 
Paignton, South Devon – Whitehill Country Park – New Road – Completed 2014 
Ongoing scheme of improvement works to Whitehill Caravan Park. 
 
Current works include the re-alignment and construction of a new tarmac road and upgraded bases for new holiday chalets. 
 
Service trenching. 
 
Chudleigh, Devon – J Lockyer and Associates – 2nd Retaining wall – Completed 2014 
Extensive re-construction of a failed retaining wall in the rear gardens of private properties in Chudleigh, adjacent the river. 
 
Our schedule of works has included; 
 
As previous; anti pollution measures and protection of working areas. 
A new concrete base foundation constructed on the edge of the river bank 
Formation of new gabion basket wall – 3 metres high. 
Reinstatement of garden area and fencing. 
Reinstatement of field with tree planting 
 
Torquay – Mount Stuart Hospital, Ramsay Health Care Uk – New Car Park – Completed 2014 
Formation of new car park for hospital visitors on the site of a former chapel. 
 
Pavilion’s works include; 
 
Site clearance and cart away 
Ground preparation works 
Gullies and soakaways 
Block retaining walls 
Kerbing 
Parking area to be finished in block paviors 
 
Tiverton – Private Client – Construction Of New Driveway And Patio Area – Completed 2014 
 
Our works include; 
 
Setting out 
Reduce dig 
Retaining walls 
Flights of steps 
Construction of slabbed patio area 
Fencing 
Construction of new driveway, finished surface in block paviors. 
 
Denbury – Private Client – Groundworks Package For New Detached Dwelling – Completed 2014 
 
Pavilion’s groundworks include; 
 
Access drive 
Excavation works for new strip foundations 
Concreting works 
Floor slab 
Domestic drainage including soakaways 
 
Newton Abbot – Keyworker Homes Ltd – New Car Parking – Completed 2014 
 
Formation of new car parking areas for newly constructed retirement flats on the site of the former Newton Abbot Hospital. Our works have included; 
 
Groundworks 
Reduce level dig 
Kerbing 
Tarmac works and white lining 
Natural stone walls 
Installation of security bollards 
 
Marlborough – South Hams – CG Fry & Sons – Groundworks And External Works For 17 New Dwellings – Completed 2014 
 
Site clearance and formation of new Devon hedge to encompass large bio-diversity area. 
Erection of protective species fencing 
Excavation to reduced levels 
Formation of roads and sewers 
Foundations up to DPC 
Drainage and soakaways 
Formation of sustainable permeable parking areas 
Service trenching 
Hard landscaping works including screen walls, planters, recycling bases 
Retaining walls 
 
Denbury – Private Client – Groundworks For Contemporary New Dwelling – Completed 2014 
 
Removal of existing concrete floor and stanchion bases 
Reduce dig, level and compact 
Excavation and concrete new foundations 
Blockwork to DPC level 
Formation of radon sumps and associated ducting 
Drainage works 
Concrete floor slab 
Landscaping works 
 
West Ogwell – Private Client – Groundworks For Major Extension To Converted Barn 
 
Our works include; 
 
Demolition of existing structure 
Reduce dig 
Mass block retaining wall 
Concrete raft foundation 
Drainage works 
Additional garage raft foundation 
Superstructure to first floor level including block and beam floor 
 
Liverton, South Devon – Shaylor Group Plc – New Gospel Hall – 2015 
Groundworks and access road for the construction of a new build gospel hall for main contractors Shaylor Group Plc. 
 
Pavilion’s schedule of works includes; 
 
Reduce dig 
Bulk filling 
Foundations to dpc 
Drainage 
Septic tank 
Access road 
Car parking 
External works 
 
Click on this text to edit it. 
The Arboreteum, Collaton – Private Client 
 
A prestigious and exclusive 5 star holiday resort and country club. Includes cottages, apartments, restaurant, bars, stunning pools and treatment rooms. Pavilions works include, phase 1 works; 
 
Foundations 
Sub Structures 
Drainage 
Reduced level dig 
Car Parking 
Landscaping 
 
Dawlish – Millwood Property Investment Management Company Ltd 
 
Groundworks for the construction of new industrial units. Works include; 
 
Foundations 
Groundfloor slabs 
Mains Drainage 
Car Parking 
External Works 
 
Smithaleigh, Lee Mill – Spectrum Energy Systems Ltd – New Wind Turbine Bases – 2015 
Another renewable energy project for Spectrum in South Devon.  
 
Our works include; 
 
Excavation of two turbine bases 
Concrete blinding 
Fabrication of steel re-inforcing 
Mass concrete pour 
Setting of turbine bases 
 
Sandridge – South Hams – Knight Frank Estate Management 
 
Interesting project following a landslip on the river Dart, forming new access to a holiday boathouse. The works involve the construction of a series of raised timber steps and landings over a steeply wooded slope from the banks of the river into the tree line. 
 
Excavate and concrete pads to support timber posts. 
Design and construct a series of timber steps and landings with safety rails. 
Form path to top of access track. 
 
 
Our site uses cookies. For more information, see our cookie policy. Accept cookies and close
Reject cookies Manage settings