Beverley Bay Paignton - Private Client Phase 2 
 
The latest phase in ongoing improvement and upgrading works. 
 
Construction of new road 
New Parking and Drives 
Domestic footpaths 
Drainage 
Service trenching 
Landscaping 
 
Paignton – Private Client - Beverley Bay Caravan Park – Improvement Works 
 
A super family run holiday park set on The English Riviera, undertaking upgrading works to their site for the new season. Our project works include; 
 
Breaking up redundant bases 
Re-profiling bank 
Extending existing bases 
Forming new access driveways and associated paving 
 
Edeswell Farm Country Caravan Park South Brent - Edeswell Valley Ltd 
Phase 2 
 
Ongoing scheme of improvement works with addition of new leisure complex. 
 
Demolition of existing buildings 
New foundations 
Drainage works 
Services work 
 
Rattery South Brent - EBC Ltd - New & Improvement Works 
 
Upgrading and new works to holiday complex. 
 
Site clearance 
Reduce level dig 
New foundations 
Extension to existing foundations 
Concrete floor slabs 
Retaining walls 
Bradninch – For Main Contractor Groundworks And External Works For 15 New Dwellings 
 
Works include; 
 
Site preparation, stripping topsoil 
Foundations 
Domestic and mains drainage, sewers 
Construction of car parking areas 
Roads 
External Works 
Dawlish - Private Client 
Re-configuration of existing driveway, additional  
improvements and re-surfacing. 
 
Highweek Newton Abbot - Private Client 
Reduce dig, construction of retaining wall and new stable block base. 
 
Smithaleigh Lee Mill – Private Client New Wind Turbine Bases 
 
Another renewable energy project for Spectrum in South Devon. 
 
Our works include; 
 
Excavation of two turbine bases 
Concrete blinding 
Fabrication of steel re-inforcing 
Mass concrete pour 
Setting of turbine bases 
Rattery South Brent – For Main Contractor – Groundworks Package 
 
Schedule of works to include; 
Reduce dig, levelling, foundations, roads, sewers, retaining walls, external works. 
 
Denbury – Private Client – Groundworks For Contemporary New Dwelling  
 
Our works for this new build included; removal of existing concrete floor and stanchion bases, reduce dig, new foundations, blockwork, ducting, drainage and landscaping. 
 

Marlborough South Hams – For Main Contractor – External Works Phase 2   Final stage of external works to 17 new houses. Pavilion’s contract of works includes; Roads, parking spaces, patios edgings, steps, top soiling, communal areas. 

Upton Pine Exeter – For Main Contractor Groundworks Package For 7 New Homes 
 
Strip soil and excavate, sewers, manholes, new roads, concrete foundations, blockwork, block and beam floors, drainage, parking areas, paving and external works. 
 
 
Torquay - Mount Stuart Hospital - Private Client - New Car Park 
 
Formation of new car park for hospital visitors on the site of a former chapel. 
 
Pavilion’s works include; Site clearance and cart away, ground preparation works, gullies and soakaways, block retaining walls, kerbing, paviored parking. 
 
Tiverton – Private Client – Construction Of New Driveway And Patio Area  
 
An extensive programme of external works; 
setting out, reduce dig, retaining walls, flights of steps, the building of a new slabbed patio area, fencing and the construction of a new paviored driveway. 

Marlborough South Hams – For Main Contractor – External Works Phase 2   Final stage of external works to 17 new houses. Pavilion’s contract of works includes; Roads, parking spaces, patios edgings, steps, top soiling, communal areas. 

Liverton South Devon – For Main Contractor – New Gospel Hall 
 
Groundworks and access road for the construction of a new build gospel hall for main contractors Shaylor Group Plc. 
 
 
Dinnaton Golf Club - Ivybridge - Private Client 
Improvement and upgrading works to the grounds of the golf club and fitness studio. 
 
Works included; 
Preparation groundworks to paths and car parking areas 
Drainage 
Tarmac surfacing 
Denbury – Private Client – Groundworks Package For New Detached Dwelling 
 
Pavilion’s groundworks include; Access drive, strip foundations, concrete works including floor slab and domestic drainage. 
 
 
Newton Abbot – For Main Contractor New Car Parking  
 
Formation of new car parking areas for newly constructed retirement flats on the site of the former Newton Abbot Hospital. Groundworks, kerbing, tarmacking and stone walls. 
 
Marlborough – For Main Contractor Groundworks And External Works For 17 New Dwellings - Phase 1 
 
Site clearance, large bio-diversity area, roads and sewers, foundations, drainage, soakaways,trenching, permeable parking areas. 
 
Haytor – For Main Contractor Reconstruction Of Failed Retaining Wall. 
 
Clearance of collapsed wall and construction of new foundation and mass block retaining wall to engineer design, dry stone walling and terrace. 
 
Chudleigh – For Civil & Structural Engineers - Phase 1 
 
Reconstruction of failed 3 metre high wall adjacent to river and dwelling using steel gabion baskets and re-instatement works. Anti pollution measures. 
 
Whitehill Country Park Paignton  
Private Client 
 
Drainage, trenching and upgrading works, new bases and hard landscaping works to countryside caravan and lodge park. 
 
The Arboreteum Collaton – Private Client Phase 1  
 
A prestigious and exclusive 5 star holiday resort and country club. Includes cottages, apartments, restaurant, bars, stunning pools and treatment rooms. Pavilions works include, phase 1 works; foundations, sub structures, drainage, reduced level dig, car parking, landscaping. 
 
West Ogwell – Private Client Groundworks For Major Extension To Barn Conversion 
 
Full groundworks package and additional superstructure works on barn conversion, including; demolition of existing structure, mass block retaining wall, raft foundation, drainage works, garage foundation and superstructure to first floor level including block and beam floor. 
 
Sandridge South Hams – For Property Management Services 
 
Interesting project following a landslip on the river Dart, forming new access to a holiday boathouse. The works involve the construction of a series of raised timber steps and landings over a steeply wooded slope from the banks of the river into the tree line. Works including; excavation and concrete pads, design and construct a series of steps and landings with safety rails. 
Ashprington Nr Totnes – Private Client Restoration Works and External Hard Landscaping 
 
Removal of existing old extension and return to original, creation of large, new patio area, renovation of driveway, steps and planters on a grade II listed property. 
 
Wind Turbine Project – Private Client  
 
225 kw wind turbine at Marley in the South Hams was constructed to generate an income from the sale of electricity and the Feed-In-Tariff.  
Torquay – For Main Contractor Groundworks and Landscaping 
 
Large housing contract, to date covering a nine year period, works covered; roads, sewers, foundations, drainage and external finishings. 
 
Kingsbridge – For Main Contractor Groundworks and Landscaping 
 
Works on housing development of 44 units; roads, sewers, foundations, drainage and external works 
 
Buckfastleigh – Private Client Foundations and Groundworks 
 
Works to detached new build property to include; reduce dig, foundations, drainage, rainwater harvesting system. 
 
Newton Abbot – For Main Contractor Groundworks 
 
Works to new doctors surgery and retail unit on site of former Newton Abbot hospital; Foundations, floor slabs,drainage, attenuation tank, retaining walls and car parking areas. 
 
Edeswell Farm Country Caravan Park South Brent - Edeswell Valley Ltd - Phase 1 Improvement Works 
 
A picturesque and tranquil holiday park set in 23 acres of the Devon countryside, consisting of luxury lodges and self catering cottages. For the new 2016 season the owners are currently undertaking a major scheme of new, upgrading and improvement works for the whole site. 
Pavilion’s schedule of works includes; 
 
Extensive site clearance works 
Surveying and engineers setting out works 
Co-ordination of mains and domestic services 
Reduce dig over steeply wooded site and cut and fill 
Re-inforced concrete lodge bases 
Drainage schemes 
Excavate and construct new access roads 
Drystone walling and landscaping works 
Dartington Post Office – Private client Raft foundation 
 
Construction of reinforced concrete raft foundation to form new garage and store. 
 
Mayfield School Torquay – For Main Contractor - Groundworks 
 
Groundworks package for large extension to school including reinforced ground beams on piles. 
 
Dawlish – For Main Contractor 
 
Groundworks for the construction of new industrial units. Works include; foundations, groundfloor slabs, mains drainage, car parking and external works. 
 
Occombe Farm Torbay – Private Client 
 
Preparation works for new agricultural units including landscaping. 
 
 
Dartmouth – Private Client  
Landscaping 
 
Creation of new tracks, steps and stone walls on steep wooded hillside. New patio areas in natural paving slabs. 
 
Former Newton Abbot Hospital – For Main Contractor – Groundworks 
 
Construction of new roads and sewers to service retirement homes, new doctors surgery and retail units. 
 
Plymouth – For Main Contractor 
 
LABC 2012 award winning site. Roads, sewers, foundations, retaining walls and external works on new homes development site. 
 
Tiverton – For Main Contractor 
 
First phase of roads and sewers to new housing estate. 
 
Chudleigh Knighton – For Main Contractor  
 
Roads, sewers foundations and external works for 63 houses including construction of large culvert to carry stream and formation of a new roundabout and section 278 works. 
 
Cullompton – For Main Contractor Groundworks 
 
Roads and sewers to residential housing estate of 49 houses, works included; kerbs, footpaths, trenching, drainage, car parking and patios. 
 
Exmouth – For Main Contractor 
 
Foundations and floor slabs to form a new build development behind a listed facade. 
 
Sandridge Barton – For Property Management Services 
 
Construction of new industrial unit on a private estate for use as a grain store/winery.